Page 15 - LEED PLANNING DOCUMENT JL
P. 15

preformed quarterly during the                    The results will determine the
                       first year of patient and staff                   design decision making in

                       occupancy. (Cit.2 “Enhanced                       terms of what type of systems
                       Commissioning”)                                   will be specified for St.
                   •  Optimized Energy                                   Joseph’s. It is the hospital’s and
                       Performance- Option 1. Whole                      design team’s goal to achieve a

                       Building Energy Simulation. The                   48% improvement rating in
                       design team will analyze                          energy performance in
                       efficiency measures based on                      addition to the minimum

                       published data during the                         energy performance
                       design process beginning no                       requirement.
                       later than the schematic phase.