Page 42 - Moldex3d training Manual
P. 42

2.4.4.2.5  V-P Switch-Over
            The  “V-P  Switch-Over”  controls  when  the  filling  stage  switches  to  the  packing  stage.    As  previously
            discussed, there are two main stages for filling; the Velocity-controlled phase (Filling) and the Pressure-
            controlled phase (Packing).  This setting allows for a transition period between the two phases.

            Typically, this will be set to 98% if no other process data is provided.




















            2.4.4.2.6  Melt and Mold Temperatures
            Melt Temperature and Mold Temperature defaults are brought from the material file, as discussed in
            3.4.3.2.3.                                                                   Commented [GU11]: change from 3.4.4.2.3 to 3.4.3.2.3 -
                                                                                         SS
            Based on the material’s testing, a range (Maximum and Minimum) are included as well, which define the
            recommended limits for the Melt and Mold Temperatures in simulation.  If these values are passed, a
            warning will pop up, recommending staying within the range.

                                               41
   37   38   39   40   41   42   43   44   45   46   47