Page 59 - TECHNICAL SPECIFICATION FOR PALM OIL REFINING_rev.1 - Copy_Float
P. 59

OFFER NO. KMIPL/P16E0097R7
                                                      100 TPD PHYSICAL REFINERY AND FRACTIONATION
                                                                                              Page No. 59/69



               6.3.3. All measurements shall be made as per the specifications in Clause 1 to 5

                       above. All arrangements for measurement shall be provided by the BUYER
                       free of cost as per KUMAR’s specification.


               6.4.4  All measurements shall be made only during the steady state condition of

                       the plant and only reading recorded during the steady state condition will
                       be considered for evaluating the plant performance.


                       In case of brief interruption (not exceeding 4 hours per 24 hours) In the
                       operation of the plant, necessary  correction will be made for the plant

                       down time as well as for the starting and unsteady operation.


                       In case of interruption totaling more than 8 hours in 72 hours as well as

                       in case of frequent interruptions within a shift, the performance trial will

                       be repeated.

               6.4.5  If the performance trail has to be repeated several times and performance

                       evaluation could not carry out within  a period of 30 days for reasons
                       attributable to buyer, KUMAR shall be absolved of giving the performance

                       trial.


               6.4.6  The measurement  is subject to accuracy of instruments used. All

                       performance guarantees will be subject to a variation of ±5%.


               6.4.7  Any variation beyond  ±5% in the performance of any  one of the
                 parameters will be offset against the variation in other parameters.


                       A.5.1  If after the completion of performance trials, the plant performance
                              of process guarantees or utility guarantees are not met and if the

                              plant has to be modified as per this Agreement, performance trial

                              will be repeated after completion of such modifications.