Page 639 - Facilities Master Plan 2016
P. 639

Lodi Unified School District                                            Lodi Unified School District
          Oakwood Elementary School                                               Oakwood Elementary School
          Facilities Master Plan - Total Program Cost                             Facilities Master Plan - Total Program Cost
          Opinion of Probable Cost                                    19-Apr-16   Opinion of Probable Cost                                    19-Apr-16
                         Project Cost Summary (2016$) - Oakwood Elementary School                Project Cost Summary (2016$) - Oakwood Elementary School
                                                       Construction Costs   Total Project                                     Construction Costs   Total Project
          Item                      Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)  Item     Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)
          11 Library & Student Support Services            $                       -  $                             -  16 Next Generation Classroom Flexibility (Furniture)  $                       -  $                             -
            11a Elementary School Library/Innovation Lab                           16a Flexible furniture (Per Classroom, Direct Cost)                     21 ea  $       15,000.00
            11a.4 Reconfigure Library/Innovation Lab Building                3,780 sf  $             244.00
            11d Learning Center
            11d.4 Reconfigure Learning Center                2,040 sf  $             237.00  17 Technology Infrastructure         $                 32,000 $                      32,000
                                                                                    17c MDF and IDF data rooms with environmental control
                                                                                   (direct cost only)                             1 ea  $       32,000.00 $              32,000
          12 Safety, Security & Campus Control             $              770,000 $                 1,024,000
            12b Safety improvements to and/or new parent/bus drop-off areas and parking
            12b.1 New Parking Lot              24,800 sf  $               16.00 $            397,000  Total Construction/Project Cost (2016$)  $           3,994,000  $5,301,000
            12b.3 Entry Plaza                     1,750 sf  $               26.00
            12b.9 Repair existing Parking Lot                9,200 sf  $                 6.30 $              58,000
            12b.11 New concrete walkways                3,490 sf  $               15.00 $              52,000  The following items are excluded from this budget:
            12b.12 Repair concrete walkways                   825 sf  $                 8.00 $                 7,000  Utility hook-up fees & City connection fees.
            12c Covered Walkway                      450 sf  $               90.00 $              41,000  Offsite work and traffic signals.
            12d Exterior lighting to ensure student safety                        1 ls  $       40,000.00 $              40,000  Land acquisition costs.
            12e Safety locks at classroom doors                     35 ea  $             449.00 $              16,000  Hazardous material surveys, abatement, and disposal.
            12f Signage for emergency response and wayfinding                        1 ls  $       32,000.00 $              32,000  Escalation (Costs are in 2016$ calculated to the end of the year).
            12g Marquee Sign                              1 ea  $       10,000.00 $              10,000
            12h Fencing with controlled campus entrances
            12h.2 Decorative Metal Fencing & Gates                   265 lf  $             252.00 $              67,000
            12i Fire safety equipment, fire alarms and emergency lighting
            12i.1 Fire Alarm System             28,001 sf  $                 5.40
            12i.2 Emergency Lighting             28,001 sf  $                 1.40
            12j New public address/emergency communication
            systems                            28,001 sf  $                 7.60
            12k Intrusion alarms               28,001 sf  $                 1.80 $              50,000
          13 District Support Facilities                   $                       -  $                             -
            Not included in this Facilities Needs Assessment
          14 Outdoor Learning Environments & Quads         $                       -  $                             -
            14b Learning Courts
            14b.2 New Learning Court                8,400 sf  $               20.70
           15 Exterior Play Spaces, Playfields & Hardcourts  $                       -  $                             -
            15a Kindergarten Play Yard
            15a.1 New Rubberized Surface Play Area                2,000 sf  $               20.00
            15a.3 Shade Structure                 1,200 sf  $               90.00
            15b PE Play Yard & Hardcourts
            15a.1 New Rubberized Surface Play Area                2,400 sf  $               20.00
            15b.3 Relocate Elementary Play Apparatus                        1 ea  $       18,000.00
            15b.4 Shade Structure                 2,400 sf  $               90.00
            15b.5 Resurface & Repair Hardcourts             36,450 sf  $                 5.00
            15b.8 Basketball Court/Sports Equipment                        1 ls  $       25,333.33
            15c Playfields
            15c.2 New natural grass turf area             44,550 sf  $               10.00


         Prepared by: LPA, Inc. / Cumming                                        Prepared by: LPA, Inc. / Cumming


         6.3       APPENDIX                                                                                                    Facilities Master Plan  610
                   DETAILED PRIORITIZED COST ESTIMATE                                                                      Lodi Unified School District