Page 196 - FreesStyler® Installation and Startup
P. 196

®
            INSTALLATION AND STARTUP


            Chapter 9 Optional “Add-On” Items


            HydroBlade® Purge Air Assembly


               Installation
                   4.  Cut the airline at 2” from the bulkhead and insert the MAC Valve Assembly as shown.







                                Cut the airline                Insert MAC
                               here at 2” from              Valve Assembly
                                 the bulkhead






                   5.  Install a section of 1/2” airline as shown below.



















                                       Install
                                       Airline here



                   6.  Run the electrical lead from the MAC valve to port #5 on the Electrical Junction Block located in the C-
                       Channel in the Carriage as shown below.











                                                                       Connect Electrical
                                                                       Feed as shown here






            9-64        Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681       1MANUL220
   191   192   193   194   195   196   197   198   199   200   201