Page 66 - FreesStyler® Installation and Startup
P. 66
®
INSTALLATION AND STARTUP
Chapter 4 Frame and Carriage Assembly
Bulkhead Block and Utilities
Note: The hoses when placed in the Boom Channels will require 52” of slack minimum as shown
below.
52” Measurement taken from one edge of the Boom
Channel to the other edge of the Boom Channel
1) Move the carriage to the exit end hard stop to ensure the boom does not completely straighten.
2) Move carriage to the entrance end hard stop to ensure that the boom does not completely
straighten. This is the initial position the machine will be in when routing the utilities.
4-24 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL220