Page 67 - FreesStyler® Installation and Startup
P. 67

®
                       INSTALLATION AND STARTUP


                       Chapter 4 Frame and Carriage Assembly


                       Bulkhead Block and Utilities

                              Note:  The image below shows the route that the utilities are to be laid out.














                                                         Driver Side Boom   Passenger Side Boom

                       3)  Locate your field supplied poly-flow tubing and hoses. Run the hoses over the white plastic disk
                          through the wall mount boom arm, through the machine mount boom arm, and onto the machine.
                          Make sure the utilities have an acceptable bend radius, as shown below, on the machine. The
                          worst bend radius for the lines on the machine is here at the entrance end of the machine.
















                       4)  Lay the 6 motor leads, 6 field supplied 3/8” poly flow tubes, and the single 1/2” main air poly flow
                          tube into the bottom of the channel. Follow that with the 3 umbilical cords and finally the 3 water
                          hoses (always place on the outside of the bend radius).








                                6 motor leads, the 5 field supplied   Add 3 umbilical cords   Add 3 water hoses and the large yellow

                               3/8” poly-flow tubes and the single                     high-pressure hose.
                                  1/2” main air poly-flow tube
                              Note:  When all utilities are in place, there should be enough slack so there is no binding of any
                                     hoses.