Page 67 - FreesStyler® Installation and Startup
P. 67
®
INSTALLATION AND STARTUP
Chapter 4 Frame and Carriage Assembly
Bulkhead Block and Utilities
Note: The image below shows the route that the utilities are to be laid out.
Driver Side Boom Passenger Side Boom
3) Locate your field supplied poly-flow tubing and hoses. Run the hoses over the white plastic disk
through the wall mount boom arm, through the machine mount boom arm, and onto the machine.
Make sure the utilities have an acceptable bend radius, as shown below, on the machine. The
worst bend radius for the lines on the machine is here at the entrance end of the machine.
4) Lay the 6 motor leads, 6 field supplied 3/8” poly flow tubes, and the single 1/2” main air poly flow
tube into the bottom of the channel. Follow that with the 3 umbilical cords and finally the 3 water
hoses (always place on the outside of the bend radius).
6 motor leads, the 5 field supplied Add 3 umbilical cords Add 3 water hoses and the large yellow
3/8” poly-flow tubes and the single high-pressure hose.
1/2” main air poly-flow tube
Note: When all utilities are in place, there should be enough slack so there is no binding of any
hoses.
1MANUL220 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 4-25