Page 68 - FreesStyler® Installation and Startup
P. 68

®
            INSTALLATION AND STARTUP


            Chapter 4 Frame and Carriage Assembly


            Bulkhead Block and Utilities

            5)  Have a helper hold the lines with the correct bend radius on the machine head and tie the utilities
               to the machine mount boom arm tightly using the 4 sets of slots in the channel.
               Tie the three 3/4’’ water hoses and the poly flow tubing together tightly in all four slots.

               Tie the 6 motor wires to the boom channel using the four slots tightly.







                                    Tie-Wrap Slots


            6)  Move the machine to the position where the wall mount bearing is completely lined up with the
               machine mount bearing as shown in Step 3. At  this point, the lines are at the smallest  bend
               radius on the boom.























































            4-26        Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681       1MANUL220
   63   64   65   66   67   68   69   70   71   72   73