Chapter 4 Frame and Carriage Assembly
Bulkhead Block and Utilities
5) Have a helper hold the lines with the correct bend radius on the machine head and tie the utilities
to the machine mount boom arm tightly using the 4 sets of slots in the channel.
Tie the three 3/4’’ water hoses and the poly flow tubing together tightly in all four slots.
Tie the 6 motor wires to the boom channel using the four slots tightly.
Tie-Wrap Slots
6) Move the machine to the position where the wall mount bearing is completely lined up with the
machine mount bearing as shown in Step 3. At this point, the lines are at the smallest bend
radius on the boom.