Page 71 - FreesStyler® Installation and Startup
P. 71
®
INSTALLATION AND STARTUP
Chapter 4 Frame and Carriage Assembly
Optional Deluxe Boom
Connecting the Boom
1) Move the carriage to the exit end hard stop to ensure the boom does not completely straighten.
2) Move carriage to the entrance end hard stop to ensure that the boom does not completely straighten. This is the
initial position the machine will be in when routing the utilities.
1MANUL220 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 4-29