Page 72 - FreesStyler® Installation and Startup
P. 72

®
            INSTALLATION AND STARTUP


            Chapter 4 Frame and Carriage Assembly


            Optional Deluxe Boom


               Routing the Airlines
               3)  At this point it is time to route the lines thru the new deluxe boom. Please take note but do not start running the
                   lines until you read the next few steps to understand the order and location of the lines. The lines will need to be
                   ran in 5 steps
                       a.  Through the 50” section of liquid tight tube
                       b.  Through the machine mounted Boom Arm section (atop the carriage)
                       c.  Through a center sections of liquid tight tube at the center of the boom
                       d.  Through the Wall Mount Boom Arm
                       e.  Finally through another 28” sections of liquid tight tube located atop the carriage
                   It is imperative to leave a loop at the area entering the boom and leaving the boom to allow the utilities to properly
                   bend through the booms motion. This should be checked and adjusted as necessary on the startup of the
                   machine. Also leave a little slack in the center area of the boom to allow the hoses to bend properly.

               4)  Take all of the gray motor cables and run them through the pipe located to the inside of the boom bend, this pipe
                   is designated for the three phase wires only and no other utilities should run thru this pipe. Be sure to run the
                   cables thru each of the five stages and to the equipment room.
               5)  Take the three yellow junction box wires and run them from the machine back through each section of the “outer
                   tube”.
               6)  Take the airlines and connect them in the equipment room. From there. Run them out to the machine through the
                   outer tube that houses the yellow cables. Finally, connect each airline to the proper port as shown below.

                                                                   1/2 Triple Foam Feeds (Optional)





                                                                 Red        Yellow      Blue



                        3/4” Reclaim Feed (Optional)
                                                            3/8” Drying Agent
                                                             Feed (Optional)   Extra   Extra



                                                             3/8” Sealer Wax   3/8” Soap   1/2” Main
                           3/4” R.O. Feed (Optional)
                                                             Chemical Feed   Chemical   Air Feed
                                                               (Optional)   Feed




                            3/4” Fresh Water Feed










            4-30        Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681       1MANUL220
   67   68   69   70   71   72   73   74   75   76   77