Page 31 - Chameleon® Arch Series
P. 31

CHAMELEON® ARCH SERIES


                       Installation


                       Additional Options: Side Pendants
                              4)  Secure the sign mount weldment directly to the arch as shown below

                                 Utility Arch:
                                                            Before    After












                                 Spray Arch:
                                                            Before    After













                              5)  Once the sign mount weldment is mounted onto the arch simply place the swivel nipple into the coupling on
                                 the sign mount weldment and tighten the sign down to the desired angle.





































                       1MANUL526             Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681        27
   26   27   28   29   30   31   32   33   34   35   36