Page 41 - Chameleon® Arch Series
P. 41
CHAMELEON® ARCH SERIES
Installation
Additional Options: Foam Pods
Tri-Mounted Single Foam Pod
Single Pods / Single Color: If you are planning on running one color of chemical
through each pod, then you will use both 3-way dividers to split the air and
chemical/water feeds to all three foam pods. Use the images below for more detail.
Air
Feed
Chemical /
Water Feed
Typical Utility
Connections
Air Feed Chemical/Water
Feed
Single Pods / Three Colors: If you are planning on running a different color through
each foam pod (3 colors total), then you will use one of the 3-way dividers to split the air
to all three foam pods. Take the other 3-way divider and remove the three, 3/8” stem x
1/4” tube elbows. Place one of the elbows in to each of the 1/2” x 3/8” unions. Now run
one color to each union. Use the images below for more detail.
Air
Feed
Chemical /
Water Feed
Typical Utility
Connections
Air Feed
Chemical/Water
Feeds
7) At this point you can refer back to the previous foam pod mounting section to route the
main 1/2” airlines to the center of the Neon Arch and the 1/4” airlines to each side. Use
the images below for routing the 1/4” airlines to the center foam pod assembly.
1MANUL526 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681 37