Page 44 - Chameleon® Arch Series
P. 44
CHAMELEON® ARCH SERIES
Installation
Additional Options: Rain Arch
4) Locate the 3/8-16 bolts, the 3/8 flat washers, and the 3/8-16 nylock nuts. Face the barbed
hose fitting towards the equipment side wall and then mount the Rain Arch bar assembly
to the top mount bars as shown in the images below. You can tighten all of the 1/4-20
and the 3/8-16 bolts at this time.
Before
After
5) Run the field supplied 3/4” water feed hose to the barbed hose fitting and clamp it in
place.
At this point you can refer to the supplied Rain Arch manual for the initial startup
instructions and the maintenance procedures.
40 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681 1MANUL526