Page 43 - Chameleon® Arch Series
P. 43

CHAMELEON® ARCH SERIES


                       Installation


                       Additional Options: Rain Arch
                              2)  Install the top mount bars and the shim plates on top of the cover using the supplied 1/4-
                                 20 bolts, lock washers, and flat washers. Do not tighten the bolts yet. Use the images
                                 below for more detail.

                              Note:  You will need to remove the 1/4-20 button head screws and the white plastic caps at this
                                     time if you have already mounted the front pendent cover.


                                 Step 1: Remove button screws
                                 and plastic caps









                                 Step 2: Locate the brackets and
                                 appropriate fasteners












                                 Step 3: Secure brackets to the
                                 pendant











                              3)  Locate the selected Rain Arch bar weldment (100 hole, 200 hole, or 300 hole), the 3/4”
                                 stainless plug and the 3/4” stainless steel barbed hose fitting. Apply Teflon tape and
                                 liquid Teflon to the plug and the barbed hose fitting and tighten them into the Rain Arch
                                 bar weldment.








                              Note:  Be sure to install the hose fitting on the utility room side of the manifold.