Page 43 - Chameleon® Arch Series
P. 43
CHAMELEON® ARCH SERIES
Installation
Additional Options: Rain Arch
2) Install the top mount bars and the shim plates on top of the cover using the supplied 1/4-
20 bolts, lock washers, and flat washers. Do not tighten the bolts yet. Use the images
below for more detail.
Note: You will need to remove the 1/4-20 button head screws and the white plastic caps at this
time if you have already mounted the front pendent cover.
Step 1: Remove button screws
and plastic caps
Step 2: Locate the brackets and
appropriate fasteners
Step 3: Secure brackets to the
pendant
3) Locate the selected Rain Arch bar weldment (100 hole, 200 hole, or 300 hole), the 3/4”
stainless plug and the 3/4” stainless steel barbed hose fitting. Apply Teflon tape and
liquid Teflon to the plug and the barbed hose fitting and tighten them into the Rain Arch
bar weldment.
Note: Be sure to install the hose fitting on the utility room side of the manifold.