INSTALLATION & STARTUP
Chapter 22 Initial Startup Procedure
Startup Procedure
Locate your supplied Programming Manual. Read and understand the following chapters:
· Programming
· General Machine Operation
· General Methods of Using Operator Interfaces
You should also familiarize yourself with the standard user screens.
MCC
1) Check for proper voltage at MCC, 120V at SCC, and proper voltage at the Dryer Panel.
CONSULT A TRAINED ELECTRICIAN. ONLY TRAINED OR AUTHORIZED
INDIVIDUALS KNOWLEDGEABLE IN THE RELATED PROCEDURES SHOULD
INSTALL, INSPECT, MAINTAIN OR SERVICE THIS EQUIPMENT.
2) Confirm that the power to the MCC is off at load center (building electrical Panel), then turn on all breakers, close
the door and turn on the disconnect.