INSTALLATION & STARTUP

            Chapter 6 Frame and Carriage Assembly



            Frame Assembly (Floor Mounted)
                   8)  To assist in the installation process later, drop a plumb bob from the center of the entrance and exit cross-
                      beam as shown below and mark the floor. Once marked, draw a reference line the width of the bay also
                      shown below.
                                                                               Drop plumb-line
                                                                              from exit surface of
                                                                               entrance head
                                                                                  beam









                                     Drop plumb-line
                                      from entrance
                                    surface of entrance
                                       head beam








                                                         Plumb-bob and
                                                         line on the floor