            Chapter 6 Frame and Carriage Assembly



            Frame Assembly (Hybrid)

               Laying the Frame Out on the Floor
                   3)  At this point the orientations of the Oval Leg Mount Clamps and the Leg Base Plates have been determined.
                      Secure all four Oval Leg Mount Clamps to the legs at a distance of 1-1/2’’ from the end of the Crossbeam for
                      all bay widths. See image below for a typical example.


















                         1-1/2”
                    From end of
                     Crossbeam
                        (typical)






                   4)  After the complete frame and options have been laid out on the floor. Any necessary modifications to the
                      brackets  have  been  made  and  you  are  satisfied  that  all  components  will  fit  in  your  bay  move  on to  the
                      erecton and installation of the Hybrid Frame.