Page 89 - Saber® Installation & Startup
P. 89
INSTALLATION & STARTUP
Chapter 6 Frame and Carriage Assembly
Frame Assembly (Hybrid)
Securing the Frame to the Wall
1) Measure a distance of 101-3/4’’ up from the ground at the lowest point in the wash bay and mark a line on
the wall the length of the bay.
101-3/4”
From closest point of the floor
allowing for a slopped floor.
This will result in 106-1/2“
minimum height under the
headbeam.
2) Using a forklift on each Crossbeam, clamp the Crossbeams firmly to the forks as shown below.
Note: Be sure to place some sort of protective material such as cardboard or cloth
between the Crossbeams and the forks or clamp to protect the powder coating
from damage.
Typical
1MANUL290 Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 6-27