Page 89 - Saber® Installation & Startup
P. 89

INSTALLATION & STARTUP

                      Chapter 6 Frame and Carriage Assembly



                      Frame Assembly (Hybrid)

                          Securing the Frame to the Wall
                             1)  Measure a distance of 101-3/4’’ up from the ground at the lowest point in the wash bay and mark a line on
                                 the wall the length of the bay.






                                                                             101-3/4”
                                                                             From closest point of the floor
                                                                             allowing for a slopped floor.
                                                                             This will result in 106-1/2“
                                                                             minimum height under the
                                                                             headbeam.









                             2)  Using a forklift on each Crossbeam, clamp the Crossbeams firmly to the forks as shown below.
                                 Note:  Be sure to place some sort of protective material such as cardboard or cloth
                                        between the Crossbeams and the forks or clamp to protect the powder coating
                                        from damage.








                                                      Typical


























                       1MANUL290       Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681   6-27
   84   85   86   87   88   89   90   91   92   93   94