Page 23 - DuraTrans XD® Conveyor
P. 23

DURATRANS XD® CONVEYOR



                      Installation


                      Permanently Welding the Conveyor into Place
                          1)  Weld a leg onto every leg of the conveyor.
                          2)  Down the passenger side the legs are welded down the steel angle mounted into the floor.
                          3)  On the driver side the legs will support the weight, but the conveyor should be welded to the
                             top steel angle at all upright legs.
                          4)  Confirm that the top, middle and lower levels of the conveyor are flush (straight and level).
                          5)  Weld the seams of the top surface, inside and outside guide rails then weld the seams of the
                             lower track.
                          6)  Grind the welds smooth on the surfaces where the Rollers or tires ride.
                          7)  Some fabrication will have to be done with the lead “ON” and “OFF” the conveyor. The Y-
                             Section should be fabricated at this time.
                             Note:  All angle iron, ramps and legs stated in this section are field supplied.






















































                      1MANUL010           Belanger, Inc.® * PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681     19