Page 41 - DuraTrans XD® Conveyor
P. 41
DURATRANS XD® CONVEYOR
Installation
Installing the Plastic Guide Rail
3) After all the plastic pieces are placed onto the guide rail angle, locate the supplied Guide Rail
FIXTURE CLAMP (part #102941) as shown below.
4) Secure the clamp into the first hole position and drill down through the center hole on the
fixture as shown below using a 13/32 (0.406) drill bit. This will produce properly aligned holes
in the plastic for the supplied 3/8-16 x 1-1/4” button-head fasteners and 3/8-16 center-lock
nuts on the underside of the guide rail.
Install fasteners in sequence down the rail to prevent the plastic from moving on the
angle and causing hole-misalignment.
Drill down through hole here
1FSTNR-BH510: 1NUT-CL375:
Button-Head Fastener Center-Lock Nut
5) Repeat this process until all plastic pieces are in place and secure. Tighten each nut and bolt
down as you work your way down the conveyor. This will minimize bowing of the plastic due to
temperature changes.
Note: Make sure the seams are tight as you work your way down the conveyor.
1MANUL010 Belanger, Inc.® * PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 37