Page 41 - DuraTrans XD® Conveyor
P. 41

DURATRANS XD® CONVEYOR



                      Installation


                      Installing the Plastic Guide Rail

                          3)  After all the plastic pieces are placed onto the guide rail angle, locate the supplied Guide Rail
                             FIXTURE CLAMP (part #102941) as shown below.








                          4)  Secure the clamp into the first hole position and drill down through the center hole on the
                             fixture as shown below using a 13/32 (0.406) drill bit. This will produce properly aligned holes
                             in the plastic for the supplied 3/8-16 x 1-1/4” button-head fasteners and 3/8-16 center-lock
                             nuts on the underside of the guide rail.

                             Install fasteners in sequence down the rail to prevent the plastic from moving on the
                             angle and causing hole-misalignment.

                                                           Drill down through hole here




                                                                           1FSTNR-BH510:   1NUT-CL375:
                                                                         Button-Head Fastener   Center-Lock Nut









                          5)  Repeat this process until all plastic pieces are in place and secure. Tighten each nut and bolt
                             down as you work your way down the conveyor. This will minimize bowing of the plastic due to
                             temperature changes.

                             Note:  Make sure the seams are tight as you work your way down the conveyor.

























                      1MANUL010           Belanger, Inc.® * PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681     37
   36   37   38   39   40   41   42   43   44   45   46