Page 15 - TopWinder®
P. 15

®
                                         ®
                       TopWinder


                       Installation


                       Frame Assembly
                          Layout Arm Assemblies

                          1)  Locate both Arm Assemblies and lay them down in the tunnel in the approximate location
                              where the TopWinder® will be installed. The driver side Arm has two Bearings one attached
                              to each side of the Mount Plate, refer to the image below.



                                        Passenger Side Arm Assembly










                                                                                Driver Side Arm Assembly

                                      Filler Strips

                                                      Bearing on each side
                                                       of the Mount Plate



                                                                                                 Conduit Fitting,
                                                                                               Motor & LED Cables




                                                                   Conduit Fitting,
                                                                  Motor & LED Cables


                          2)  The Arm Assemblies come with the Filler Strips already installed. Check to make sure the
                              Filler Strips are secure and are the proper length.

                          3)  The driver side Arm Assembly will also have two conduit fittings attached and the wires for
                              the Motor/Gearbox and LED will be extending out of the fittings.























                       1MANUL755            Belanger, Inc.® * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        11
   10   11   12   13   14   15   16   17   18   19   20