Page 19 - TopWinder®
P. 19
®
®
TopWinder
Installation
Frame Assembly
Tunnel Placement
As stated earlier, tunnel depth placement will vary from site to site. The image below shows the
correct side-to-side placement.
Note: The image below is shown with the Over-Under Conveyor option. Your system may have
the standard Guide Rails. Placement is the same for both.
Overhead View
Direction
of Travel
47-1/2”
Note: The 47-1/2” dimension is taken from the outside driver side leg base plate to the inside
guide rail.
1MANUL755 Belanger, Inc.® * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 15