             Installation


             Frame Assembly
                Erecting the Frame
                1)  Locate  the  shipping  skid  used  when  the  unit  arrived  and  slide  it  under  the  Crossbeam
                    Assembly and clamp the TopWinder® to the skid.
                                                  CAUTION

                       Be sure to clamp equipment securely to the forks of the forklift.
                             Do not stand under load while forklift is in operation.

                2)  Slowly raise the skid until the Legs are hanging in a vertical position and move the unit into
                    its tunnel location.






















                3)  Anchor the driver side leg to the floor keeping in mind the required operating space for other
                    tunnel components.

                4)  Check that the frame is square by verifying the same distance between the upper and lower
                    Legs on both sides. Lag the passenger side leg to the floor.


                    Note:  Verify that both arms make contact with the rubber Posi-Stops.