Installation
Frame Assembly
Erecting the Frame
1) Locate the shipping skid used when the unit arrived and slide it under the Crossbeam
Assembly and clamp the TopWinder® to the skid.
CAUTION
Be sure to clamp equipment securely to the forks of the forklift.
Do not stand under load while forklift is in operation.
2) Slowly raise the skid until the Legs are hanging in a vertical position and move the unit into
its tunnel location.
3) Anchor the driver side leg to the floor keeping in mind the required operating space for other
tunnel components.
4) Check that the frame is square by verifying the same distance between the upper and lower
Legs on both sides. Lag the passenger side leg to the floor.
Note: Verify that both arms make contact with the rubber Posi-Stops.
16 Belanger, Inc. ®* 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL755