Page 46 - TopWinder®
P. 46
®
®
TopWinder
Installation
Main Water Feed
1) Using a field supplied clamp, secure a 3/4” water line to the Main Feed Fitting coming out of
the Crossbeam as shown below.
3/4” Main
Water Feed
2) Using field supplied tie straps, tie the water feed, the Motor/Gearbox and LED electrical lines
together as shown below. Doing so will prevent the utilities from being damaged during the
pivoting motion of the Top Wheel.
3/4” Main
Water Feed
LED
Main
Lead
Motor/Gearbox
Main Lead
42 Belanger, Inc. ®* 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL755