Page 45 - TopWinder®
P. 45
®
®
TopWinder
Installation
Electric Motor Installation
Motor/Gearbox and LED Electrical Cables Routing
1) The Motor & LED Electrical Cables have been pre-routed through the driver side Arm
Assembly and the ends are extending out through the conduit fittings. Route both cables
through the Conduit supplied in the Accessory Box. Refer to the image below.
Motor Main Power
LED Main Conduit Fitting
Power
Driver Side
Arm Assembly
Motor/Gearbox
and LED Cables
Electrical
Enclosure
Conduit
Conduit
Conduit Fitting
2) One end of the Motor/Gearbox Cable and LED Cable will be connected to their
corresponding Main Power Supply Line in the Electrical Enclosure, shown above.
3) On the other end the LED Cable has already been connected to the Slip Ring in the
previous section. The Motor/Gearbox cable will need to be connected to the Motor; remove
the cover on the Motor Electrical Box, route the Motor Cable through the Motor Cord Grip
and secure to the four (4) wire leads. See the image below.
CAUTION
It is recommended that a licensed electrician is contracted to perform all electrical installations.
Motor Electrical
Box Cover
Motor Cable
Motor/Gearbox
Cover Asy
Motor Cord
Grip
Screws (2)
4) After the Motor has been wired, secure the Upper Cover onto the plastic Motor Cover using
the supplied self-tapping screws.
1MANUL755 Belanger, Inc.® * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 41