Page 19 - MixStir® Chemical Delivery System
P. 19

MIXSTIR® CHEMICAL DELIVERY SYSTEM

                       Installation


                       Mounting the MixStir®

                          1)  Locate the MixStir® assembly and notice the mounting orientation as shown below.

                                                     Basic, Single or                          Twin Panel
                                                     Triple Foam Panel                         System
                                                     System









                          2)  On the rear of the tank assembly there is an overflow fitting that will require a 1/2” hose that
                              is run down to a splash-safe location.

















                          3)  Determine the location in the building where the MixStir® is going to be located.  Position it
                              on wall allowing for placement of chemical drums to be located under the holding tank.

                              Note:  To maximize the efficiency of your MixStir® a location should be selected that  will
                                      minimize the utility lines length.

                              As stated above, there are two types of wall mounting bracket available for the MixStir®.
                              Your purchase determines the type that shipped with your unit. See the images below for
                              identification.
                                   Basic, Single or Triple Foam Panel              Twin Panel System
                                               System




















                       1MANUL450             Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        15
   14   15   16   17   18   19   20   21   22   23   24