Page 17 - H2AIR® Arch
P. 17
®
H2AIR ARCH
Installation
Inspection Shipment & Install Airis® Assemblies onto Air Cannon™ Dryer Housings
1) Uncrate and inspect the shipment for damage and verify that all of the pieces are there.
Note: If there is any damaged equipment, file a claim with the trucking company immediately.
Receiving party is responsible for filing claim with trucking company. Notify your local
distributor or Belanger, Inc. immediately if shipment is determined damaged or incomplete.
2) Locate the H2AIR® Top Assembly which includes the Head Beam, Top Flip Dryer Assembly
with DryLite™ Air Cannon™ Housings and Top Manifold Assemblies with LED lights and
Covers.
Top Flip Dryer Assembly DryLite™ Air Cannon™
Housings (2)
Head Beam
Top Manifolds
with LED Lights Shipping
H2AIR® Top Assembly Bracket
Shipping
Bracket
3) Before removing the H2AIR® Top Assembly from the shipping pallet install the Airis®
Assemblies onto the Air Cannon™ Dryer Housings.
4) Locate the Airis® Air Cannon™ Dual Kit, shown below.
3/8” Lock Washer (8)
3/8”-16 Nyloc Nuts (8)
Airis® Air Panel Airis® Mounting Studs (8)
Union-Y 3/8”T x 1/4” Fitting (2)
Airis®
Clockwise (CW)
Assembly
Airis®
Counter-Clockwise (CCW)
Assembly
1MANUL958 Belanger®, Inc. *PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 13