Page 22 - H2AIR® Arch
P. 22

®
                H2AIR  ARCH


                Installation

                Prepare to Assemble Arch
                     1)  From the Head Beam remove and discard the shipping brackets and nuts. Be sure to keep the
                        bolts and locking washers these will be used to attach the Leg Assemblies to the Head Beam.






                                                                                            Top Flip Dryer
                                                                                            Assembly


                                   Head Beam

                 Shipping
                Bracket  to
               be discarded
                                                                                               Nuts to be
                                                                                               discarded


                                                           Bolts & Lock Washers                              Shipping
                                                            to be used to attach                            Bracket  to
                                                            Legs to Head Beam                              be discarded
                                                Top Manifolds
                                                with LED Lights





                     2)  Secure the H2AIR® Top Beam Assembly to a forklift and position it in the approximate location
                        in the tunnel.
                     3)  Orient the H2AIR® Top Assembly in the tunnel so the Belanger® Logo faces the entrance of the
                        tunnel and the DryLite™ Air Cannon™ Nozzles face the exit of the tunnel, see image below.









                                                                                                       Passenger Side




                       Driver Side






                                                                                View  from Entrance of Tunnel





                   18     Belanger, Inc.® *PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681       1MANUL958