H2AIR ARCH
Installation
Attach Leg Assemblies to Head Beam Assembly
5) For each Leg Assembly the following three (3) lines need to be routed through the Head Beam
before attaching the Leg to the Head Beam.
Two (2) water hoses for the Leg Manifold from each Leg Assembly
One (1) Electrical Cable for each Leg Manifold LED
6) Route the LED cable and two Water Hoses from each Leg Assembly into the Head Beam then
through the openings near the center of the Head Beam, as shown in the image below.
Head Beam
Slot for
Utility Lines
Slot for
Utility Lines
Utility Lines
from PS Leg
Assembly
Utility Lines from
DS Leg Assembly
Driver Side
Leg Assembly Passenger Side
Leg Assembly
Step 6 & 7
From the Leg Assemblies route the
LED Cable & two (2) Water Hoses into
the Head Beam through the slots near
the center of the Head Beam.
Then attached the Leg Assemblies to
Fastener & Lock Washer the Head Beam.
4 per Leg Assembly
7) Attach the Leg Assemblies to the Head Beam using the supplied fasteners and a 3/4” wrench,
as shown in the image above.