                Installation
                Tunnel Placement

                    10) Verify the passenger leg is square and plumb in all directions using a level; shims may be used
                        under the foot plate if necessary.
                    11) Drill the lag holes in the concrete and use the supplied 5/8” lag bolts to secure the passenger foot
                        plate to the floor.

                       Note: Remember to verify where any underground heat or utilities run so you can be sure to not
                             drill into them with the hammer drill when making the lag holes.
                       Note: Do not hammer the lag bolts all the way down at this time, leave room to raise the foot plate
                             later if necessary.





















                                                                                              Passenger Side

















                          Driver Side





                                                                             5/8” Lag Bolts