Installation
Tunnel Placement
5) Once the driver side leg is square and plumb in all directions, drill the holes in the concrete and
use four (4) of the supplied 5/8” lag bolts to secure the driver side foot plate to the floor.
Note: Remember to verify where any underground heat or utilities run so you can be sure to not
drill into them with the hammer drill when making the lag holes.
Note: Do not hammer the lag bolts all the way down at this time, leave room to raise the foot plate
later if necessary.
Passenger Side
Driver Side
5/8” Lag Bolts
(4 per Leg)
6) Next, for the passenger side foot plate, measure 139-½” from the OUTSIDE edge of the driver
side foot plate toward the passenger side of the tunnel and mark a line at this distance on the
floor.
22 Belanger, Inc.® *PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL958