Page 11 - Titan VPS™
P. 11

TITAN VPS™


                       Overview


                       Typical Installation Example

                                        Back Room                          Tunnel (view from exit)

                                                                           2” line overhead installation
                                                                    Option to run along wall to ash Module, then down the leg
                                                                               of the Wash Module



                                  2” ball valve
                                  (fill suction line here)









                            2”
                         suction
                           line




                                                                  Return line from conveyor pit
                                      3/4” to 1” return line
                                                                         Optional 2” underground line installation

                      Lines to settling tanks                       (shown with dotted lines), Preferred Installation Method



































                        1MANUL743            Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681       9
   6   7   8   9   10   11   12   13   14   15   16