Page 12 - Titan VPS™
P. 12
TITAN VPS™
Overview
Typical Settling Tank (Not for construction)
3” suction line
Drain to
sanitary
Union
(for removal of the flap
valve and strainer) Water level Water level
Line from
conveyor
pit
Flap valve and
strainer
5” Sediment
When installing the Flap Valve in the horizontal position, make sure area
marked “THIS SIDE UP” faces upward!
Flap Valve / Strainer Assembly
Note: Shown with Flap Valve and Strainer used only on the underground tank. For the
aboveground installation, use a check valve with 3 to 5 pound spring.
10 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681 1MANUL743