             Typical Settling Tank (Not for construction)


                                                                          3” suction line
              Drain to
              sanitary
                           Union
                           (for removal of the flap
                           valve and strainer)   Water level    Water level


                                                                                                 Line from
                                                                                                 conveyor
                                                                                                 pit
                            Flap valve and
                              strainer


                                                                    5”          Sediment








             When installing the Flap Valve in the horizontal position, make sure area
             marked “THIS SIDE UP” faces upward!










                                        Flap Valve / Strainer Assembly

                    Note:  Shown with Flap Valve and  Strainer  used  only on the underground tank. For the
                           aboveground installation, use a check valve with 3 to 5 pound spring.