Page 16 - Titan VPS™
P. 16
TITAN VPS™
Installation
Titan Pump Station Pressure Gauge Installation
The pump station has the option of mounting the Pressure Gauge on either side allowing easier access to
it once secured to the floor. Be sure you keep this in mind when deciding where to permanently place it.
1) Determine which of the ports is best suited for your location and locate the supplied Pressure
Gauge.
2) Secure the Gauge into place and plug the other side with the supplied plug.
Plugged
Gauge in Port
Place
Gauge
Port
Titan Pump Station Electrical Connections
3Phase wiring
Pump station requires two, 3phase connections:
• 3HP priming pump
• 10HP booster pump.
Each of the two motors requires 3 conductors and ground.
3 phase junction box, 3HP
3 phase junction box, 10HP