Page 13 - Titan VPS™
P. 13
TITAN VPS™
Installation
Titan VPS™ Tubes
1) Remove 1-1/4” NPT x 10-1/2” nipple from the rear of each tube.
2) Remove 6 black plastic caps and screws from manifold and tube.
End cap
mounting
screw
(typical)
3) Remove Titan tube body with dome from manifold weldment.
4) Drill 2 holes, 1/2” diameter in cement per layout 130” apart.
Overhead View
This dimension taken from front
hole of detail plate (typical)
130” 130”
35” 45”
5) Insert the provided lag bolts into the holes, but do not secure them at this time.
1MANUL743 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 11