Page 13 - Titan VPS™
P. 13

TITAN VPS™


                       Installation


                       Titan VPS™ Tubes

                              1)  Remove 1-1/4” NPT x 10-1/2” nipple from the rear of each tube.
                              2)  Remove 6 black plastic caps and screws from manifold and tube.

                                                                                           End cap
                                                                                           mounting
                                                                                           screw
                                                                                           (typical)



















                              3)  Remove Titan tube body with dome from manifold weldment.
                              4)  Drill 2 holes, 1/2” diameter in cement per layout 130” apart.
                                                               Overhead View



                                                                                       This dimension taken from front
                                                                                       hole of detail plate (typical)

                                            130”                                    130”








                                  35”                                     45”




                              5)  Insert the provided lag bolts into the holes, but do not secure them at this time.
















                       1MANUL743            Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681       11
   8   9   10   11   12   13   14   15   16   17   18