Page 28 - Top Wheel Mix & Match
P. 28
TOP WHEEL Mix and Match
Installation
Frame Assembly
Tunnel Placement Overview
As stated earlier, tunnel depth placement will vary from site to site. The images below show the
correct side-to-side placement.
Note: The image below is shown with the Over-Under Conveyor option. Your
system may have the standard Guide Rails. Placement is the same for both.
45”
Floor
Direction
of Travel
Note: The 45” dimension is taken from the outside driver side leg base plate, to
the inside guide rail.
24 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL749