Page 22 - Revit Architecture Basics
P. 22

VIEW MANAGEMENT



          View management


          When a view is opened, other views do not close down. They are located behind the active
          view. If you select a view that is open already, but is not the active view, the view located behind
          it, opens. There will not be opened copies of the views.

          Managing views, such as switching between the
          open views or arrange open views side by side, can
          be done in tab:
           View ► Windows



          During the work on the model, it can be an
          advantage to be able to see multiple views
          simultaneously. It is done with Tile or hotkey WT.

          The dark blue border indicates which view is active.



          If an item is selected, the selection is visible in all
          views, and the selection is retained, even if switching
          to another view.





          With multiple views promoted on the screen, there is
          a distinction between the two Zoom tools:

          Zoom to Fit (ZF) zooms in the active view, and then
          the entire model can be seen in the drawing area.

          Zoom All to Fit (ZA) zooms in all views, so that the
          entire model can be seen in the drawing area.




























          22                                                                                       NTI
   17   18   19   20   21   22   23   24   25   26   27