Page 22 - Revit Architecture Basics
P. 22
VIEW MANAGEMENT
View management
When a view is opened, other views do not close down. They are located behind the active
view. If you select a view that is open already, but is not the active view, the view located behind
it, opens. There will not be opened copies of the views.
Managing views, such as switching between the
open views or arrange open views side by side, can
be done in tab:
View ► Windows
During the work on the model, it can be an
advantage to be able to see multiple views
simultaneously. It is done with Tile or hotkey WT.
The dark blue border indicates which view is active.
If an item is selected, the selection is visible in all
views, and the selection is retained, even if switching
to another view.
With multiple views promoted on the screen, there is
a distinction between the two Zoom tools:
Zoom to Fit (ZF) zooms in the active view, and then
the entire model can be seen in the drawing area.
Zoom All to Fit (ZA) zooms in all views, so that the
entire model can be seen in the drawing area.
22 NTI