Page 76 - Best Practices In Knowledge Transfer Programme(KTP) Phase 1
P. 76
IMPLEMENTATION OF
IMPLEMENTATION OF
KNOWLEDGE
PROJECT
PROJECT
TRANSFERRED
1. The practical usage of thermal camera for gas leakage detection and inspection.
2. An automatic system for real time monitoring and detection of gas leakage.
SECTION C: FINANCIAL INFORMATION
ITEMS KTP GRANT KTP GRANT UTILISATION CONTRIBUTION
(RM) BALANCE (RM) PERCENTAGE % FROM INDUSTRY (RM)
AMOUNT 164,896.88 0.00 100.00 35,000.00
SECTION D: IMPACT AND MEASUREMENT METHODS
IMPACT MEASUREMENT METHODS
Increase in The system is ready to be used by consultant and user
Product Quality 03
Benefits for IPTA Collaboration with consultant and oil and gas industry
(Recognition for
Academician)
Human Capital Out of two (2) graduate interns involved with this project, one of them has been offered a job
Development (Graduate in Kerteh as an engineer whilst the other 1 pursues her masters study.
Intern Employability)
02
65
02
Intangible Benefits 1. Establishment of network and reducing the gap between university and industry.
2. Industrial exposure to UMP’s staff and graduate interns.
Visit by internal evaluation team to Petronas LDPE Kerteh
BUKU KOLEKSI AKTIVITI TERBAIK KTP
Best Practices in KTP
Best Practices in KTP
PROF. DR. KAMARUL HAWARI BIN GHAZALI