Page 356 - Six Sigma Advanced Tools for Black Belts and Master Black Belts
P. 356
OTE/SPH
OTE/SPH
3:7
August 31, 2006
Char Count= 0
JWBK119-21
References 341
3. Xie, W., Xie, M., and Goh, T.N. (1995) A Shewhart-like charting technique for high yield
processes. Quality and Reliability Engineering International, 11, 189--196.
4. Kuralmani, V., Xie, M., and Goh, T.N. (2002) A conditional decision procedure for high yield
processes. IIE Transactions, 34, 1021--1030.
5. Tang, L.C. and Cheong, W.T. (2004) Cumulative conformance count chart with sequentially
estimated parameter. IIE Transactions, 36, 841--853.
6. Yang, Z., Xie, M., Kuralmani, V., and Tsui, K.L. (2002) On the performance of geometric charts
with estimated control limits. Journal of Quality Technology, 34, 448--458.
7. Xie, M., Goh, T.N., and Kuralmani, V. (2000) On optimal setting of control limits for geometric
chart. International Journal of Reliability, Quality and Safety Engineering, 7, 17--25.
8. Zhang, L., Govindaraju, K., Bebbington, M., and Lai, C.D. (2004) On the statistical design of
geometric control charts. Quality Technology and Quantitative Management, 1, 233--243.
9. Haldane, J.B.S. (1945) A labour-saving method of sampling. Nature, 155, 3924.