Page 356 - Six Sigma Advanced Tools for Black Belts and Master Black Belts
P. 356

OTE/SPH
 OTE/SPH
                         3:7
          August 31, 2006
                              Char Count= 0
 JWBK119-21
                                       References                            341
      3. Xie, W., Xie, M., and Goh, T.N. (1995) A Shewhart-like charting technique for high yield
        processes. Quality and Reliability Engineering International, 11, 189--196.
      4. Kuralmani, V., Xie, M., and Goh, T.N. (2002) A conditional decision procedure for high yield
        processes. IIE Transactions, 34, 1021--1030.
      5. Tang, L.C. and Cheong, W.T. (2004) Cumulative conformance count chart with sequentially
        estimated parameter. IIE Transactions, 36, 841--853.
      6. Yang, Z., Xie, M., Kuralmani, V., and Tsui, K.L. (2002) On the performance of geometric charts
        with estimated control limits. Journal of Quality Technology, 34, 448--458.
      7. Xie, M., Goh, T.N., and Kuralmani, V. (2000) On optimal setting of control limits for geometric
        chart. International Journal of Reliability, Quality and Safety Engineering, 7, 17--25.
      8. Zhang, L., Govindaraju, K., Bebbington, M., and Lai, C.D. (2004) On the statistical design of
        geometric control charts. Quality Technology and Quantitative Management, 1, 233--243.
      9. Haldane, J.B.S. (1945) A labour-saving method of sampling. Nature, 155, 3924.
   351   352   353   354   355   356   357   358   359   360   361