Scope of Work Criterion 5
Project Scope
SECTION 5. Project Specific Scope of Work:
Temporary Power
Utility installation charges X Power company fees or costs.
Cost of power consumption X Utility charges or deposits.
Metered temporary electrical service X Within 100’ of utility service.
240/120 volt 1-phase service X
208/120 volt 3-phase service X If available.
480 volt 3-phase service X
GFCI protected; 20 amp circuits. See note f.
General 120 volt power outlets X
below.
Special purpose power outlets X
Per OSHA minimum standards during day-
General purpose lighting X
light hours only.
Task lighting X
Night time site lighting X
Security lighting X
Office trailer electrical power connection X
Office trailer telephone service entrance X
Buck hoist connection X
Tower crane connection X
Concrete placement boom X
Motorized scaffolding X
Temporary power for fire pump X
Temporary power for early HVAC equipment X
Temporary power for early elevator use X
Temporary generators X
Addi.onal comments:
A. Salvaged material and equipment will remain the property of Tri-City Electrical Contractors, Inc.
B. No provisions have been included for the connec.on of services to other subcontractor’s field office trailers.
C. No provisions have been included for addi.onal IT services (data outlet wiring, CCTV, web-cam, empty raceways, etc.)
D. No provisions have been included for security / intrusion alarm systems. Tri-City Electrical Contractor, Inc. | Electrical Proposal
E. No provisions have been included for early start-up of permanent systems (HVAC, elevators, pool equipment, etc.) on tempo-
rary power. The temporary service and distribu.on has not been sized to accommodate these loads.
F. When permanent power is applied to the facility and used for construc.on purposes, the trade using the permanent power will
be responsible for their own GFCI protec.on. We have made no provisions for addi.onal GFCIs on the permanent wiring.