Page 35 - Trail Winds Proposal E2
P. 35
Scope of Work Criterion 5
Construc.on
SECTION 5. Project Specific Scope of Work:
Full time safety officer X
Full time QA/QC officer X
Professional liability insurance for design-
X
build systems required
BIM Coordination with other trades X
Handling of owner finished equipment X
Offsite parking X
Offsite storage X
Bussing of employees to jobsite X
Painting of any surface (conduits, etc.) X
Waterproofing and pitch pans X
Temporary power and lighting X
GPR or X-ray of existing slabs, walls or ceil-
X
ings
Cutting and patching of architectural surfac-
X
es
ICRA containment structures X
ICRA cart for work outside the ICRA contain-
X
ment area
Fire stopping of electrical penetrations
X
where passing through fire rated walls
Acoustical caulking of electrical penetrations
X
where passing through smoke walls
Commissioning assistance X
AHCA Inspection assistance X
Owner Furnished Equipment:
Single point power connection to:
Headwalls X
Footwalls X
Sink walls X
Pre-fabricated toilets X
Surgical lights or booms X
Site Work:
Primary service conduits X
Secondary electric feeders and ductbanks X
Emergency power feeders and ductbanks X
Low voltage primary service conduit X Tri-City Electrical Contractor, Inc. | Electrical Proposal
Import or export of fill dirt X
De-watering / Well Pointing X
Cutting & patching of roads, drives, etc. X
Concrete encasement of ductbanks X
Concrete equipment pads X
Concrete pole bases X
430 West Drive | Altamonte Springs, FL , 32714 | 407-788-3500 34