Criterion 5 Scope of Work
Construc.on
SECTION 1. Summary of the Work:
Our proposal is based upon the current RFP Desingn Narra.ve, drawings and specifica.ons. The overall pro-
ject scope includes 170,000 sqH of structure for the new hospital, new CEP and site work. This proposal is
based upon construc.ng the en.re project in a LEAN method to reduce overlap in scope and provide the ut-
most quality.
SECTION 2. RFP Documents:
MEP RFP Ocala Trailwinds 9/14/21
Final Dev Package 02/03/21
EDI Checklist 03/24/21
Trailwinds MEP RFP Schedule 09/24/21
Start-up Package with Sample Subcontract N/A
Construc.on Condi.oning – V3.0 N/A
Tri-City Electrical Contractor, Inc. | Electrical Proposal Duct Cleanliness – V3.0
N/A
SECTION 3. BIM Coordina-on:
BIM or clash detec.on coordina.on is included for major elements of the electrical package