Page 36 - Trail Winds Proposal E2
P. 36

Criterion 5                                                          Scope of Work



        Project Scope



          SECTION 5. Project Specific Scope of Work:




                  Specialty Rooms:
                  Trench and wall ducts with dividers          X
                  Aluminum raceways required for MRI rooms     X

                  Special Systems Matrix:                     Incl           Notes              Comments
                  Low voltage rough-in:
                       Voice / Data systems                    X          See note E  Conduit and backbox rough-in
                       CATV / MATV System                      X          See note E  Conduit and backbox rough-in
                       Access Control System                   X          See note E  Conduit and backbox rough-in
                       CCTV System                             X          See note E  Conduit and backbox rough-in
                       Intrusion detection system              X          See note E  Conduit and backbox rough-in
                       Clock System                            X          See note E  Conduit and backbox rough-in
                       Public Address System                         X
                       DAS                                           X
                       Intercom System                               X
                       Background Music System                       X
                       Sound System                                  X
                       Audio / Video System                          X
                       Trash Chute Control System                    X
                       Irrigation Controls                           X

                  Low voltage wiring, terminations &
                  equipment:
                       Lightning Protection                    X          See note A
                       Fire Alarm System                       X          See note A
                       Smoke Control System                          X
                       Nurse Call System                             X
                       Code Blue System                              X
       Tri-City Electrical Contractor, Inc.  |  Electrical Proposal
                       Patient Wandering System                      X
                       Med Gas system wiring                         X
                       Electrical power monitoring system            X
                       Building automation system                    X
                       DAS                                           X
                       HVAC Controls  (regardless of voltage)        X




         Notes:
         A.  This system is complete and opera.onal.
         B.  This system includes cables and jacks.  Equipment, instruments and their installa.on are by others.
         C.  This system includes cables.  Jacks, equipment, instruments, and their installa.on are by others.
         D.  This system includes a complete empty raceway system only.  Cables, jacks, equipment, instruments and their installa.on are
            by others.
         E.  This system includes outlet boxes with a conduit stub to an accessible ceiling space only. Cables, jacks, equipment, instruments,
            and their installa.on are by others.
         F.  This system only includes monitoring by the fire alarm system of smoke control equipment provided and installed by others.
         G.  This system only includes 120v power connec.ons to equipment provided by others.



     35                 Tri-City Electrical Contractor, Inc.  |  “To Do More Than Expected”  |  www.tcelectric.com
   31   32   33   34   35   36   37   38   39   40   41