Criterion 5 Scope of Work
Construc.on
SECTION 4. General Qualifica-ons:
10. Elements excluded from this proposal:
a) Con.ngency fees or allowances.
b) Cable Trays
c) Pain.ng of exposed raceways and electrical equipment, or removal of hangers and straps to ac-
commodate pain.ng
d) Cost associated with liquidated damages if applicable and if values are not disclosed within the bid
documents
e) Cost and labor hours for background check if requirements are not provided within the bid docu-
ments
f) Installa.on, offloading or handling of Owner Furnished equipment
g) Any cost associated with hospital personnel being present during shutdowns, over.me, shiH work
or as escorts
h) Transporta.on of owner’s salvaged equipment to an off-site loca.on
i) Transporta.on of owner furnished products to the project site
j) ”Hot work” on energized circuits or equipment, regardless of size
Tri-City Electrical Contractor, Inc. | Electrical Proposal
SECTION 5. Project Specific Scope of Work:
General Scope:
Engineering fees X
Utility installation fees, costs, deposits X
Electrical permit fees X Included with building permit.
Material and personnel hoisting X Hoistways provided & operated by others.
Trash and debris removal X To FBO on site dumpster.
Composite clean-up crew X
Hazardous waste disposal X
Traffic control X
Access panels X
Pollution insurance X
Stretch and flex X
33 Tri-City Electrical Contractor, Inc. | “To Do More Than Expected” | www.tcelectric.com