Page 260 - MJC submissions
P. 260

31  PARA 5.4 ADDITION TO THE HOUSING MIX
               the NPPF section on delivering sufficient supply of homes is not directly applicable----the
               scheme by its nature will bring quality and extra supply

               32  PARA 5.5 AFFORDABLE HOUSING AND BROWNFIELD SITES
               maximising the use of brownfield sites

               33  5.6 EQUIVALENCE OF THE EXISTING FLOORSPACE
               footnote relating to affordable homes----will try to worm his way out of obligations

               34  5.7 NOTES ON DESIGN
               the only distinctiveness that the site displays is that of a utilitarian building of the crudest type:
               that surely not what NPPF seeks to emulate----provides a clear palette for the architect to
               produce good quality contemporary design

               35  PARA 5.8 OPTIMISATION OF DENSITY
               the NPPF advocates the optimisation of density in order to meet the need for housing land
               (paragraph 123”--- daylight and sunlight.  This guidance is indicative of the imperative to
               maximise the use of land where ever and however reasonably possible

               36  PARA 7.2 FOOTPATH AND SUSTAINABILITY
               network of existing public footpaths-- this is a resource that will be used by new residents and
               accordingly the effect of the development on the SBA et cetera will be mitigated

               37  PARA 8.1 TRANSPORT STATEMENT
               transport statement

               total rubbish dressed in my report reference--- reduction of traffic

               38  PARA 9.1 NOTES ON DESIGN
               this is not a situation where design needs to be driven by contextual considerations and the
               EDF building is a testament to have an urban form of development can exist here on its own
               design terms

               yet he admits is an eyesore and out of character


               39  PARA 10.1 CONSULTATION
               the site has previously been the subject of a pre-app consultation (DM/16/2845--- drew
               criticism of the draft design which appeared to centre on the perceived inconsistency of
               layout and design

               Between 5  July 2016 and 13  October 2016 when app was not pursued----  on 2
                                            th
                                                                                              nd
                          th
               November 2017 taken over by Frank Taylor and Lyttle associates – leading to the current
               application—
               Various layouts—not on MSDC site obtained under foi

               Key email  from King dated 12  October 2016 based on advice from Will Dorman dated 19
                                             th
                                                                                                       th
               August 2016                                                                                        Page24
                   •  Unsatisfactory layout


               E:\Cobasco\Personal,  House and computer instructions\EDF and WH Development\MJC Plans theories and
               Objectives\CONSOLIDATED SUBMISSIONS\5 Response to disclosures of 8th December.docx
   255   256   257   258   259   260   261   262   263   264   265