50+ units.  SK observed that other district plan policies (particular design) were also
               relevant… Discussion about offsetting existing floorspace against the need for affordable
               housing

               paragraph 1.22 “the adjoining life improvement Centre was briefly discussed and its allocation
               in the neighbourhood plan.  It was noted that the number of units allocated were stated as
               unknown.  DP confirmed that the reference to it in the submitted design and access statement
               was solely to demonstrate that the scheme under consideration of the EDF site would not
               prejudice the development of any potential scheme on the life improvement Centre site: and
               was not intended as a proposal for consideration the current planning application

               Will Dorman invited Darren Page to send revised proposals to him informally as they evolve:
               he would respond promptly.---------

               correspondence between Mr King and Tony Tilllin-- and finding a scheme that the officers can
               support…..


               40  10.2 EXTENSIVE CONSULTATION
               subject to extensive consultation and debate with and by local people. One meeting on-------
               site was not included --- no mention of integrated scheme……


               41  10.3 STATUTORY CONSULTEE RESPONSES
               generally responses from statutory consultation have been supportive or at least raised no
               objection and related to 71 units so it is reasonable to suppose that the proposed reduction to
               54 units will not give rise to any objection from statutory consultees

               the design review panel--- and AWVC--- overwhelming by residents—in contrast---
               overdevelopment

               42  10.4 INPUT FROM THE PLANNING CASE OFFICER
                    the revised scheme is the product of consultation in the form of correspondence and
                    meetings with the planning case officer and design officer and in particular those that
                    were raised by the design review panel


               43  11.2 MORE ON BROWNFIELD SITES
                    it is becoming increasingly important that the potential identified brownfield site is
                    optimised----
               Analysis--- WH 50 on 1.6 ha SHLAA (Merged 470 and 775 wh

               ich vanished---- )31.Ddha shown as allocated—(62.5 for 71 units)

               All cat 3=== 75 on 2.29 ha =32.5Ddha

               All brownfield in Towns of HH etc =46 dha…. Excessibe EG at ==== NIMBY

               44  11.5 MORE ON TRAFFIC FLOWS
               the scheme does not raise any traffic OR highways issues because there will be a reduction in
               traffic generation
                                                                                                                  Page26






               E:\Cobasco\Personal,  House and computer instructions\EDF and WH Development\MJC Plans theories and
               Objectives\CONSOLIDATED SUBMISSIONS\5 Response to disclosures of 8th December.docx
   257   258   259   260   261   262   263   264   265   266   267