Page 150 - Flip Area X PPP
P. 150

Numerical Description                        Adjectival Rating       Rating

            Performance  exceeding  targets  by  20%  and  above  of  the  Outstanding (O)           5
            planned targets

            (For  accomplishments  requiring  100%  of  the  targets  such  as
            those  pertaining  to  money  or  accuracy  exceeded,  the  usual
            rating of 5 for those who met targets or for those who failed or
            fell short of the targets applies.)

            Performance exceeding targets by 1% to 19% of the planned  Very Satisfactory (VS)        4
            targets

            Performance of 100% of the planned targets.               Satisfactory (S)               3

            Performance of 51% to 99% of the planned targets          Unsatisfactory(US)             2

            Performance failing to meet the planned targets of 50% or below  Poor (P)                1






                  In determining the final equivalent adjectival rating of the employee, the range of the overall point scores
           is converted as follows:

                          Numerical Rating                              Adjectival Rating
                             4.21 – 5.00                  Outstanding (O)
                             3.41 – 4.20                  Very Satisfactory (VS)
                             2.61 – 3.40                  Satisfactory (S)
                             1.81 – 2.60                  Unsatisfactory (US)
                             1.00 – 1.80                  Poor (P)


           COMPONENTS OF RATING


               1.  The overall rating of employees for a given rating period shall all be rated by the Supervisor.

               2.  Scholars, faculty on study leave, fellowship, and sabbatical leave shall be exempted from accomplishing
                   and submitting the IPCR.

               3.  Employees with designations and multiple tasks shall be rated by the supervisor/official project leader
                   concerned (for those with Research projects).

               4.  The existing QCE Teaching effectiveness shall still be used for the measurement of Effectiveness for
                   Faculty as set in the SPMS Standards.

               5.  Activities or targets that necessitate longer time to finish and is not completed 100% as planned due to
                   force majeure and/or fortuitous events shall be given consideration.



                    ======================================================================================
                     99 | P a g e - OBQA-PPP / Area X: The Administration/Bachelor of Science in Entrepreneurship
   145   146   147   148   149   150   151   152   153   154   155