PARTICULAR ELECTRICAL SPECIFICATION
                                 Version 2014-2


               1.4    PRE-START INSPECTION

               1.4.1  General

                      With prior knowledge of the proposed project scope, carry out a visual inspection of the
                      existing Electrical installations and provide a condition report and recommendations for each
                      store, the report commentary shall be inclusive of but not limited to the following subjects:

                       1.  Availability of space in the main the switchboard/switchroom  for the installation of
                           additional sub-main switches  and distribution boards  for the connection of  a new
                           Kitchen Distribution circuitry.
                       2.  Note the external diameter of the main supply cable to the store
                       3.  Note the protection setting of the main incoming switch
                       4.  Where a kitchen bus-bar has been installed identify  the manufacturer, type, existing
                           connected circuits (what they are connected to) and the number of spare tap-off points
                           available.
                       5.  Where the existing lighting and/or power distribution is installed  as singles in
                           trunking/conduit, check for the existence of individual CPCs
                       6.  Check and comment on the type, age and condition of distribution cabling generally,
                           observing suitability for extension to connect to new loads.  In the event that the
                           existing wiring systems have deteriorated, showing signs of ageing with brittle
                           insulation or over heating or have been installed in an un-safe manner (undersized
                           conductors, incorrect insulation rating, etc.) then the Contractor must notify the Project
                           Manager immediately.
                       7.  Identify the location of any proposed additional distribution boards as may be necessary
                           to complete the works
                       8.  Availability of cable routes between potential distribution points and load centres
                       9.  Notes regarding the existing method distribution to the store lighting, i.e. single core
                           cables in trunking, multicore cables on tray or in trunking, 5A sockets, KLIK sockets
                           lighting bus-bar, etc.
                       10. Status and type of fire alarm system, including notes on the availability of compatible
                           components and/or parts and suitability for extension
                       11. Extent of the existing fire alarm detection distribution, identifying any areas not
                           presently provided with detection and/or alarms, including existing voids.
                       12. Condition, type, age and extent of emergency lighting provision including exit signage
                       13. Type, method and extent of emergency lighting control/switching, including the
                           availability of test facilities for the safe use of the store manager
                       14. Any defects, omissions, non-compliances and/or safety concerns as may be identified,
                           including an explanation of the associated risk, the remedial work required to rectify
                           said matters and an estimate of the associated costs.


                      The Electrical Contractor shall make the Project Manager aware of any immediate safety
                      concerns.