Page 126 - RotF - Electrical Specification_Neat
P. 126

PARTICULAR ELECTRICAL SPECIFICATION
                                 Version 2014-2


               1.5    DESIGN PROPOSALS

               1.5.1  Initial Sketch Design

                      The Electrical Contractor will produce an outline scheme design and cost estimate for review
                      with the Project Manager based on the proposed project scope, survey and test findings as
                      applicable.

                      The design proposal is to be prepared as sketch drawings and notes and will be issued to the
                      Project Manager together with a copy of the associated inspection report for the Project
                      Managers comment and/or approval.

                      The Electrical Contractor will on request attend a meeting with the Project Management
                      team to discuss the design proposal.

               1.5.2  Construction Drawings


                      The Electrical Contractor will as a minimum, provide the following layout drawings unless
                      otherwise agreed with the Project Manager:

                       •  1:50 Layout for the Lighting, Emergency Lighting & Controls
                       •  1:50 Layout and schematic for the Fire alarms and detection system
                       •  1:50 Layout and wiring diagrams for the Small power, high and low level
                       •  1:50 Layout and wiring diagrams for the Till power & general containment, high and low
                           level

                      The Contractor will additionally provide single line diagrams for each distribution; these may
                      be appended to the associated drawing sheet or be collected on a se parate drawing.


                      Drawings will be produced using the latest edition of AutoCAD, issued and circulated
                      electronically and registered on McDonalds selected document control system, Aconex.

                      Where the scope of works is inclusive of a replacement kitchen ceiling  or otherwise as
                      directed by the Project Manager the Electrical Contractor will assist with the production of a
                      fully co-ordinated reflected ceiling plan for the kitchen showing the following:

                       •  Kitchen lights
                       •  Emergency lights
                       •  Smoke detectors
                       •  Void detection indicators
                       •  Supply and extract grilles
                       •  The location of ceiling tiles required to be accessible for duct cleaning







                                                McDonalds Restaurants Ltd
                                                           9
   121   122   123   124   125   126   127   128   129   130   131