PARTICULAR ELECTRICAL SPECIFICATION
                                 Version 2014-2


               1.6    STRIP-OUT WORKS

                      The Electrical Contractor will isolated and make safe the electrical installations in the store
                      prior to the Main Contractor taking down existing finishes and removing existing kitchen and
                      other electrical equipment in accordance with the extent of the scope.

                      Lighting in the back-of-house corridor is to be retained as installed unless otherwise
                      instructed by the Project Manager.

                      The lighting equipment will contain fluorescent lamps, which must be disposed of properly in
                      accordance with the WEEE directive The Waste Electrical and Electronic Equipment
                      Regulations 2002/96/EC and 2003/108/EC and the lamps must not be put in a skip and taken
                      to landfill sites.

                      The lamps must be taken to an approved disposal site where they can be crushed and
                      recycled.

                      The Contractor is to take note of any anomalies, defects and/or non-conformities in the final
                      connections to the kitchen equipment that may be uncovered during the strip-out process.
                      These matters are to be brought to the express attention of the Project Manager and are to
                      be corrected before the re-installation of the kitchen equipment, at the end of the kitchen
                      refurbishment.